I had a long day of priming the rooms up stairs. I was able to get two of the four bedrooms primed along with the hallway. I'm hoping to finish up one of the other rooms tomorrow and apply a second coat to the other rooms once I get home from work. Right now we are holding off on the master bedroom, as I need to do some demo work to remove a closet and renovate the bathroom. The bathroom currently has a 3' X 3' walk-in shower which we will conver to a jacuzzi style tub and shower. Also, the current sink is outside the bathroom, which I will relocate the current wall so the sink will be in the bathroom.

As for other jobs at the house, I power washed the front of the house around the door which really needed it. I also managed to mow the rest of the lawn that I started last weekend.

Other things I am hoping to accomplish this week:
  • Paint the upstairs (3 bedrooms and hallway)
  • Run wiring for the ceiling fans
  • Run wiring for the smoke detectors
  • Hang the ceiling fans
  • Hang the smoke detectors
  • Install new receptacles
  • Power wash the back porch